The PSD team have just finished upgrading the Karori ramps, the mini ramp concrete coping was replace with Premium Pool Coping. The vert ramp surface was replaced with Skate Light.
Just finished re-surfacing the original memorial park vert ramp in Tauranga. This ramp was built in the 1980’s so there was a lot of straightening of the structure and then two new layers of12mm ply and 6mm layer of skatelight were layed. The coping was changed...
Recent Comments