Just finished re-surfacing the original memorial park vert ramp in Tauranga.

This ramp was built in the 1980’s so there was a lot of straightening of the structure and then two new layers of12mm ply and  6mm layer of skatelight were layed.

The coping was changed to 60mm Galvanised coping.

img_7432 img_7437_1 img_7464_1 img_7477_0 img_7486 img_7499